Common problems of tap changer of power transformer

Oil leakage at electric welding position

SITRA.Transformer inspection ear

What is the wiring mode of dry-type transformer?

.The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils,SITRATechnical parameters of scb12 dry type transformer, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.

In fact, safety factor grounding device can be divided into grounding protection, anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.

(5) the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.


SITRAMain transformer of wind farmHow to reduce the failure



The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times,SITRA200 KVA dry type transformer, the delay time after power receiving shall not be less than 10min and the time interval of each closing shall not be less than 5min.

In fact, the industry has been trying to formulate and upgrade transformer commodities according to the specifications apart from the application of the Finance Bureau,SITRAAmorphous alloy transformer and oil immersed transformer, so as to promote the improvement of energy consumption level of transformer commodities.

The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

equipment maintenance .Brief introduction of zero line of power transformer

Oil leakage of bolt or pipe external thread

When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.


SITRAMain transformer of wind farmHow to reduce the failure



During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.

knowledge.Due to poor sealing, generally, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.

Hand touch method for transformer inspection

When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe,

SITRA.The voltage regulating tap changer is not in place or poor

The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, maintenance and transportation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.