ViggoDistribution transformer analysisTechnology and promotion for accelerating overcapacity reduction

announcer:hp122HP117294921 release time:2024-06-08 20:38:06

ViggoGrounding resistance of distribution transformer,

Dry type transformer factory

What is the reason for the shutdown of power transformer?

Viggo.According to statistics, to occupy the main global technical position, the transformer industry depends on two key data, China has been a powerful country in the production, manufacturing and application of dry-type transformers all over the world, but it is not a big country.

Deterioration damage of transformer core insulation

.Dry type transformer factory

The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

Therefore, in the operation prevention and regulation of relay protection dry-type transformer it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.


ViggoDistribution transformer analysisTechnology and promotion for accelerating overcapacity reduction



The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and D (or D) is triangular wiring.

Visual inspection method for transformer inspection

Dry type transformer

Welcome to inquire.On load commissioning:

Falling foreign matters and piercing

Noise pollution control and prevention measures of dry-type transformer


ViggoDistribution transformer analysisTechnology and promotion for accelerating overcapacity reduction



Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

Word of mouth recommendation.Operation of oil immersed transformer

How is the quality level of dry-type transformer compared with foreign countries?

35kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.

Viggo.With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, and scientific and reasonable data method is selected,ViggoGe transformer, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.

The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground,ViggoScb13-1250kva dry type transformer, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.

The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.