Ulzini6 kV TransformerHow to do daily maintenance and maintenance

announcer:hp122HP117294921 release time:2024-06-07 22:09:18

When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.

It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.

Ulzini.The visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find the abnormal conditions of the equipment, such as discoloration, deformation,UlziniBox type oil immersed transformer, offset, loosening, ignition smoke, oil leakage, broken strand disconnection, short-circuit fault marks, etching and turbidity, which can be inspected according to the visual inspection method. Therefore,UlziniHow much is a 250kVA box transformer, visual inspection is one of the common methods of equipment inspection.

Dry type transformer manufacturer

.& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, the resistance value exceeds 2m ohm bus.

Noise dispersion of dry-type transformer

Noise pollution control and prevention measures of dry-type transformer


Ulzini6 kV TransformerHow to do daily maintenance and maintenance



The key reason for oil leakage is that there are defects in cast iron parts

The dry-type transformer used for power plant voltage transformation is different from the oil transformer. It is strictly prohibited to lead the way at the bottom voltage side to prevent the insulation layer of the dry-type transformer from penetrating due to overvoltage caused by overvoltage at the power grid side or lightning stroke on the line.

Solenoid insulation deterioration

How much does it cost?.Careless maintenance and insulation damage

In the case of using dry-type transformer, customers must master the method of wiring. If there are problems in wiring, it is easy to cause common faults in application. So what is the wiring mode of dry-type transformer?

The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?


Ulzini6 kV TransformerHow to do daily maintenance and maintenance



From the appearance, the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer and only the shell can be seen for oil immersed transformer;

Quality inspection report.Oil leakage at looper flange

The rate of transformer is: n = P2 / p1x1o%, that is, when the copper loss of transformer is equivalent to iron loss, the rate is very large. Therefore, the load of transformer is: 0 = P / PK. Fully consider the active power loss caused by reactive power in the system software during transformer operation. The load adjustment is: it can be seen from the calculation of load formula that the large rate of transformer does not occur when the load is full, Generally, it is about 50%, but when selecting the transformer capacity, we should select effective transformers according to the load condition and load,UlziniPower transformer manufacturer, so as to make the transformer in the situation of economic development and achieve the goal of power saving.

Analysis of common faults of oil immersed transformer:

Ulzini.The oil in the machinery and equipment of the oil storage tank shall generally stand for more than 8h before sampling; it is not necessary to stand when sampling on the running power transformer.

If the above provisions are not met, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N2 shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, which also ensures the rated voltage of 110kV; Oil immersed transformers are generally suitable for distribution equipment.