HainingEnergy saving of distribution transformerWhat are the characteristics of subsidies

announcer:hp122HP117294921 release time:2024-05-22 13:41:25

When the transformer is put into operation, if the tap changer is not in time,HainingHow much is a 1000 KVA transformer, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.

Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling it is necessary to resolutely prevent the invasion of dirt such as rain, snow, the Ministry of finance, the Ministry of industry and information technology and the national development and Reform Commission jointly promulgated the detailed rules for the implementation of energy-saving distribution transformers of energy-saving products benefiting the people project as early as 2012, providing subsidies of 4-30 yuan / KVA for energy-saving transformers.

If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.

.If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear 4 round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for 100mm, stabilize the bell cover, and check the bearing capacity of the lifting core,Haining630kVA dry type transformer, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.

After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

For 630kVA power engineering transformer, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.


HainingEnergy saving of distribution transformerWhat are the characteristics of subsidies



In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.

With Vietnam and Malaysia, China's first UHV transmission experimental demonstration project China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world, occupying the main technical position of the industry development trend. In addition, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.

Oil leakage at looper flange

Customer first.It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.

When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?

For no-load impulse closing of transformer pay attention to the following matters:


HainingEnergy saving of distribution transformerWhat are the characteristics of subsidies



The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore,Haining315 KVA oil type transformer, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.

Quality improvement.How to reduce the failure of dry-type transformer?

The secondary inductive equipment of the distribution station (such as transformer, voltage transformer, automobile relay, AC, etc.) operates normally. According to the AC current, the winding transformer core will send out a symmetrical rhythm and a certain tone & ldquo; Buzz, buzz & rdquo; Sound. The operation staff of the transformer manufacturer should understand and grasp the characteristics of the noise. When the equipment has common faults, there will be noise and even & ldquo; Crackle & rdquo; The charging and discharging sound can distinguish the generation and characteristics of common equipment faults according to the music law and sound transformation when everything is normal and abnormal.

In terms of the place of use, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, insulated by insulating oil in the circulating system inside the transformer, and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.

The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the 45 degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.