OrlandoOil immersed 1000 KVA transformerPrecautions during maintenance

announcer:hp122HP117294921 release time:2024-05-08 09:56:44

OrlandoSingle phase oil immersed transformer,

Dry type transformer manufacturer

The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, common faults and impact. The work is diligent.

Orlando.The insulation of the through core anchor bolt clamping the iron core is damaged, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;

When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.

.The power transformer conductor refers to the connecting transmission line between each electromagnetic coil, between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.

Oil immersed transformer company

The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.


OrlandoOil immersed 1000 KVA transformerPrecautions during maintenance



(III) dry type transformers of 315KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than 5m; The distance between the electrified part and the road surface shall not be less than 5m.

Relevant responsible persons of the transformer Federation of China Household Appliance Industry Association show that the development prospect of transformers in China in the future is still the development trend of environmental protection, low noise, fire safety and explosion-proof and high reliability. There are two key development prospects: one is the development trend of high voltage and high voltage, especially 750kV and 1100kV. The second is the development trend towards environmental protection, energy conservation and miniaturization. The former key is applied to the long-distance substation project route, and the latter key is applied to the substation project route in big cities.

There are many connection groups of dry-type transformers, and the selected structures and connections are also different. Then, what are the groups of dry-type transformers? How to carry out the connection? Or basically introduce it with the network of dry-type transformer manufacturers.

Equipment maintenance.Oil leakage of cast iron parts

Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below 0.2%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.

Generally speaking,OrlandoAmerican box transformer, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer, disconnect the switching power supply on each side quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.


OrlandoOil immersed 1000 KVA transformerPrecautions during maintenance



If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for 100mm, stop the lifting stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.

Online consultation.Loose core screw

The iron loss of transformer includes two levels. The first is the hysteresis loss introduced by the transformer manufacturer. When the AC circuit is based on the transformer, according to the magnetic induction line of the transformer ferrite core, its orientation and size change with the change, which promotes the internal molecular structure of the ferrite core to interact with each other, and then loses part of electromagnetic energy, which is the hysteresis loss. The other is the vortex loss when the transformer is working.

For example, in the 1970s, the radio programs applied by every family in the countryside had a ground wire,OrlandoPower transformer 2, and they were often wet with tap water. Protective grounding is to bury the copper plate of metal electrical conductor in the soil layer, and then lead a point of it out of the road with transmission line, which completes the grounding protection. The grounding wire specifies the grounding wire resistance ≤ 4Ω. Grounding protection is a safeguard measure adopted to avoid safety accidents when using household appliances, office and other electrical equipment.