Elbaga630kVA dry type transformerLow-speed spindle unit structure design

announcer:hp122HP117294921 release time:2024-05-02 12:10:09

The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring and D (or D) is triangular wiring.

Solenoid insulation deterioration

Elbaga.Transformer inspection ear

The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.

.When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.

Causes of fire in power transformer

When we apply oil immersed transformer, pay attention to the following matters:

The transformer manufacturer shall not use hand touch method to detect energized high-voltage equipment, such as transformer in operation and neutral grounding equipment of arc suppression coil. For the equipment without power supply and whose shell is reliable grounding device, the temperature or temperature rise must be tested by hand. The secondary equipment can be inspected by hand touch method when it is hot and vibrated.

Therefore, in the operation prevention and regulation of relay protection dry-type transformer, it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.

Superior quality.Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.

During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.

What is the reason for the shutdown of power transformer?


Elbaga630kVA dry type transformerLow-speed spindle unit structure design



The hanging core of dry-type transformer is a vital part

Customer first.Causes of fire in power transformer

The grounding resistance of, high voltage and bottom voltage shall not be less than 70% (10m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed 2%, and must be technically as a certain pillar. Only in that way, the performance of dry-type transformer will be more stable. What are the common manufacturing processes and steps of dry-type transformer?

Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time,ElbagaBox type transformer room,Elbaga2000 KVA dry type transformer,Elbaga800 oil immersed transformer, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality please cut off the input switching power supply.

On load commissioning: