BagoWhat are the protections for oil immersed transformersHow is it made

announcer:hp122HP117294921 release time:2024-04-07 10:54:08

The flange surface is uneven, the tightening bolts are loose,BagoPicture of dry-type transformer grounding wire, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.

Loose core screw

Bago.Power transformer is indispensable for power stations and substations, but we must pay attention to many problems in the whole process of applying power transformer.

(II) the height width ratio of dry-type transformer pier installed on the ground is generally 0.5m, and a guardrail of no less than 7m shall be installed around it, and a warning sign shall be hung at a prominent position.

.Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time,BagoPower transformer technology series, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

Power transformer plant

If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.


BagoWhat are the protections for oil immersed transformersHow is it made



A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.

Under normal conditions,BagoDry type power transformer brand, different oil-based oils cannot be mixed. Under special circumstances, if it is necessary to use new oil of different grades, it should be determined whether the mixed oil with ice degree can be used according to the requirements of the region, and then the oil mixing test should be carried out.

When the full load test is carried out and everything is normal, it is necessary to resolutely prevent the invasion of dirt such as rain, snow wind and sand.

Noise dispersion of dry-type transformer


BagoWhat are the protections for oil immersed transformersHow is it made



According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.

Product line.The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, and the time interval of each closing shall not be less than 5min.

At that time, only a few companies in China could produce 500kV high-voltage transformers, and the market share of high-voltage transformers was basically monopolized by overseas leaders.

Brief introduction of zero line of power transformer

Bago.Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.

Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.

Oil leakage of bolt or pipe external thread