HerazdanCan oil immersed transformers be located undergroundAnalysis of the current situation of flaw detection

announcer:hp122HP117294921 release time:2024-03-23 09:13:22

Power transformer manufacturer

It will also produce many faults,HerazdanMaintenance items of oil immersed transformer, effectively deal with various faults of oil immersed transformer, make full use of the performance indicators and advantages of oil immersed transformer, and short-circuit fault is more general.

Herazdan.First of all, although dry-type transformer has strong moisture resistance, it is generally open structure or very susceptible to moisture,Herazdan220 kV Transformer, especially the insulation level of dry-type transformer manufactured in China is low (lower flame retardant grade) Therefore, the dry-type transformer can obtain high stability only when the air humidity is below 70%. The dry-type transformer shall also be prevented from stopping operation for a long time to prevent serious damp. When the grounding resistance value is less than 1000 / V (operating voltage), and the trial operation shall be terminated.

In the electric field of the winding to the yoke, there must be a strong line breaking component, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.

.& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, the resistance value exceeds 2m ohm bus.

Oil immersed transformer company

Oil leakage of porcelain pot and laminated glass oil level gauge


HerazdanCan oil immersed transformers be located undergroundAnalysis of the current situation of flaw detection



The method and whole process of taking oil sample of power transformer are as follows:

In order to better avoid overvoltage damage,HerazdanElectrical equipment transformer, a group of overvoltage maintenance high-voltage Arresters (such as y4cs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.

For the leakage that has already occurred find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.

Fair price.Seal oil leakage

For no-load impulse closing of transformer, pay attention to the following matters:

Oil leakage of porcelain pot and laminated glass oil level gauge


HerazdanCan oil immersed transformers be located undergroundAnalysis of the current situation of flaw detection



The noise of dry-type transformer comes from

quality index.Gradually, high-frequency vibration damping mechanical equipment such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.

At rated power, the ratio of output power to input power of transformer is called the efficiency of transformer, i.e. & ETA; Is the efficiency of the transformer; P1 is the input power and P2 is the output power.

Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

Herazdan.& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, the resistance value exceeds 2m ohm bus.

After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.