Apakani VillaOil immersed box transformerWhat maintenance is needed on weekdays

announcer:hp122HP117294921 release time:2024-03-15 14:37:30

The resistor is generally more than 2000 & omega;

Solenoid insulation deterioration

The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ 4Ω, According to Ohm's law when the insulating layer is damaged, the current is only 1 / 500 of the total current flow,Apakani VillaDry type transformer industry market, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.

Apakani Villa.Transformer inspection ear

Dry type transformer factory

.Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.

The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.

Connection group structure of dry-type transformer


Apakani VillaOil immersed box transformerWhat maintenance is needed on weekdays



When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases,Apakani VillaHigh overload capacity distribution transformer, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.

The top and middle of the transformer oil tank, the flange plate, barrel skin and the middle of the waterproof sleeve at the upper end of the automobile oil tank. The internal iron core and winding clamp are hot due to partial magnetic leakage, resulting in insulation damage.

A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.

Welcome calls .Oil leakage of cast iron parts

Noise solution of dry-type transformer

After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.


Apakani VillaOil immersed box transformerWhat maintenance is needed on weekdays



In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.

technological innovation.Oil leakage of bolt or pipe external thread

At that time, only a few companies in China could produce 500kV high-voltage transformers,Apakani VillaWhat is dry type transformer, and the market share of high-voltage transformers was basically monopolized by overseas leaders.

For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.

Apakani Villa.The whole process of hanging the core of dry-type transformer is more critical, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!

& ldquo; YN, D11 & rdquo;, refers to the position at 12 o'clock as the minute hand, the phase voltage phasor of the secondary side is at 11 o'clock. That is, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).

When the full load test is carried out and everything is normal, the load can be connected.