The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.

(II) the height width ratio of dry-type transformer pier installed on the ground is generally 0.5m, and a guardrail of no less than 7m shall be installed around it, and a warning sign shall be hung at a prominent position.

Parpala.At rated power, the ratio of output power to input power of transformer is called the efficiency of transformer i.e. & ETA; Is the efficiency of the transformer; P1 is the input power and P2 is the output power.

The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.

.In the electric field of the winding to the yoke, there must be a strong line breaking component, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.

In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.

When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.


ParpalaParameters of 10kV distribution transformerStorage technology



When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.

After the power transformer has been used for a long time, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:

The noise of dry-type transformer comes from

equipment maintenance .How to reduce the failure of dry-type transformer?

Oil leakage at looper flange

The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.


ParpalaParameters of 10kV distribution transformerStorage technology



With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.

Honesty is the foundation.Performance and main parameters of common metal composites,Parpala80 box type transformer, various welding processes and machinery and equipment, production and manufacturing process and quality standards of automobile oil tank, riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process,ParpalaDry type transformer Report, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, machinery and equipment of each process flow; The natural working environment is basically regulated.

Overtemperature alarm and trip: collect winding or iron core temperature data signals according to the temperature measurement resistor of PTC discrete system thermistor embedded in the bottom voltage winding. When the transformer winding temperature rises again, if it reaches 155 ℃, the system software outputs the overtemperature alarm system; If the temperature rises to 170 ℃ again and the transformer can no longer operate, the overtemperature trip data signal must be transported to the secondary maintenance circuit, and the transformer shall be tripped quickly.

If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.