Beja Transformer power capacitanceWhere is the main advantage of

announcer:hp122HP117294921 release time:2024-03-04 14:37:34

Operation and maintenance management of oil immersed transformer

Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short voltage transformation and blood pressure reduction must be carried out by the transformer.

Beja .What is the cause of power transformer core failure?

Power transformers are used in all walks of life

.The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?

The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

In specific daily life, we have a certain understanding of the optical wavelength of oil immersed transformer. What kind of function does it have for transformer?


Beja Transformer power capacitanceWhere is the main advantage of



Oil leakage at looper flange

How to select dry-type transformer

The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.

Where can I find it?.& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, the resistance value exceeds 2m ohm bus.

The insulating layer in the middle of the silicon steel plate is aging, the anchor bolt cover with the iron core is damaged, the iron core causes large vortex, resulting in heat, temperature rise, and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.

After 24 hours of continuous trial operation with a certain load,Beja Power high voltage transformer,Beja Is the dry-type transformer a box transformer,Beja High voltage distribution transformer, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.


Beja Transformer power capacitanceWhere is the main advantage of



Due to poor sealing, generally, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.

A complete range of products.The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min, and the time interval of each closing shall not be less than 5min.

Hand touch method for transformer inspection

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), the treatment goal can be achieved.

Beja .Oil leakage of cast iron parts

(IV) the transformer on the column shall be stable and firm and then tighten it after wiping the raw materials on the surface. After drying, and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

After the test, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.