Griff á DaCapacity specification of 10kV power transformerWhat technologies are needed for production

announcer:hp122HP117294921 release time:2024-02-26 13:23:42

For example, in the 1970s, the radio programs applied by every family in the countryside had a ground wire, and they were often wet with tap water. Protective grounding is to bury the copper plate of metal electrical conductor in the soil layer, and then lead a point of it out of the road with transmission line, which completes the grounding protection. The grounding wire specifies the grounding wire resistance ≤ 4Ω. Grounding protection is a safeguard measure adopted to avoid safety accidents when using household appliances, office and other electrical equipment.

Power transformer plant

Griff á Da.If the input of dry-type transformer is an alternating switching power supply, because it is DC, add a circuit in the input power supply circuit to change it into a continuously changing voltage. In that way, the alternating DC current can be obtained at the output end.

When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.

.Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ 4Ω, The resistor is generally more than 2000 & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only 1 / 500 of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.

The voltage regulating tap changer is not in place or poor


Griff á DaCapacity specification of 10kV power transformerWhat technologies are needed for production



& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, the resistance value exceeds 2m ohm bus.

The transformer manufacturer will introduce the efficiency of the transformer to you

(I) the distance between the external contour of 10kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than 1m; At the angle with actual operation,Griff á DaPower transformer impedance, a spacing of more than 2m shall be reserved; If metal fence is selected, so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out, the fixed finger is at 12 o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.


Griff á DaCapacity specification of 10kV power transformerWhat technologies are needed for production



The noise of dry-type transformer is mainly the vibration noise in operation. This vibration noise is caused by multiple positions, including the vibration of magnetic induction electromagnetic coil. All pay great attention to the solution of vibration when carrying out noise control.

Quality assurance.When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?

Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.

The main reason is that the welding quality of electric welding is poor, there are empty welding open welding, needle holes, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.

Griff á Da.In the case of using dry-type transformer, customers must master the method of wiring. If there are problems in wiring,Griff á DaThree phase oil immersed regulator, it is easy to cause common faults in application. So,Griff á DaWhat is the allowable overload of dry-type transformer, what is the wiring mode of dry-type transformer?

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.

Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod please connect all routes as far as possible to prevent other faults.