Tuusula Price of 400KVA dry type transformerQuality record control procedures

announcer:hp122HP117294921 release time:2024-02-23 14:01:29

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use,Tuusula Energy saving distribution transformer, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl,Tuusula Box transformer 500, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

After 24 hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.

Tuusula .The equipment can eliminate the shortcomings found in the patrol inspection,Tuusula Dry type scb10 transformer, clean the porcelain waterproof casing casing, remove and replace the cracked or brittle leather pad, check and tighten the node, replenish the oil with less oil, check and replace the silica gel of the breathing mask, etc.

(I) the distance between the external contour of 10kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than 1m; At the angle with actual operation, a spacing of more than 2m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.

.Solenoid insulation deterioration

& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, the resistance value exceeds 2m ohm bus.

A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?


Tuusula Price of 400KVA dry type transformerQuality record control procedures



Dry type transformer company

Precautions for trial operation of power transformer manufacturers

In the whole process of transmitting electromagnetic energy in the power supply system, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.

wholesaler.Connection group structure of dry-type transformer

Careless maintenance and insulation damage

The manufacturing process of dry-type transformer is very process, and must be technically as a certain pillar. Only in that way, the performance of dry-type transformer will be more stable. What are the common manufacturing processes and steps of dry-type transformer?


Tuusula Price of 400KVA dry type transformerQuality record control procedures



Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer causing the ignition of the casing, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.

Packaging strategy.Operation of oil immersed transformer

The insulation between silicon steel sheets is damaged, resulting in overheating and melting of the iron core;

Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).

Tuusula .The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by 20%.

Difference between dry-type transformer and oil immersed transformer: