The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is the disconnection component of the electric field is small.

Noise pollution control and prevention measures of dry-type transformer

Hapsalu.For oil transformer oil replenishment, unused transformer oil conforming to the new standard should be selected first. In addition, the oil with the same basic, same brand and same additive type is expected to have a stronger effect. The characteristics of the oil should not be lower than that of the oil in mechanical equipment. When the new remaining oil is less than 5%, there is generally no problem. However, if there is more new remaining oil,HapsaluModel of power dry-type transformer, oil shall be added before oil type Chromatographic analysis and pressure test shall be carried out to establish that there is no oil stain, and the acid value and dielectric loss shall not exceed the oil in the machinery and equipment.

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:

.The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.

Fault judgment of power transformer

When the new oil filled by the power transformer and the oil sample that has just been considered are used,HapsaluHow much is the oil transformer, the oil sample can be used only after sufficient standing.


Hapsalu100 box type transformerThe promotion plan put forward from the perspective



If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear 4 round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for 100mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, and rotate the crane to place the bell cover on the clean skid.

The dry-type transformer used for power plant voltage transformation is different from the oil transformer. It is strictly prohibited to lead the way at the bottom voltage side to prevent the insulation layer of the dry-type transformer from penetrating due to overvoltage caused by overvoltage at the power grid side or lightning stroke on the line.

Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).

How much is it.When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.

When the manufacturer of the power transformer samples from the automobile oil tank, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe, wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.


Hapsalu100 box type transformerThe promotion plan put forward from the perspective



When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, oil immersed transformers are released outward in the form of waves. This kind of wave is like a tide. It is also a kind of kinetic energy. In fact, the wave height of oil immersed transformer also shows the size of kinetic energy. Generally computer automatic system is used to control the wavelength and frequency of electromagnetic wave. The longer the light wavelength is, the greater the output power is. On the contrary, it is very small.

The grounding resistance of, high voltage and bottom voltage shall not be less than 70% (10m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed 2%, which shall not exceed 2% compared with the last accurate measurement result.

Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

Hapsalu.The flange surface is uneven,HapsaluRecovery of transformer cabinet, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.

& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, the resistance value exceeds 2m ohm bus.

In the case of dry-type transformer operation, there is more noise, and some even cause noise, which seriously endangers everyone's no problem rest time and work. At this time, the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.