ZadarOil immersed transformer 50KVAHigh temperature treatment measures

announcer:hp122HP117294921 release time:2024-02-21 10:45:12

ZadarEfficiency of power transformer,

What about oil immersed transformer fire?

The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min, and the time interval of each closing shall not be less than 5min.

Zadar.The transformer manufacturer said that the temperature display equipment: the temperature change value is measured according to the PT100 temperature sensor embedded in the bottom voltage winding to immediately indicate the winding temperature of each phase (three-phase safety inspection and Zui large value indication, and the historical time Zui high temperature can be recorded). The Zui high temperature can be input and output as 420mA analog quantity. If it is to be far away (the distance can reach 1200m, the electronic computer can be equipped with an electronic computer socket an intelligent transmitter, and 31 transformers can be detected. The over temperature alarm and trip of the system software can also be signaled by the resistor data of Pt100 thermistor sensor, so as to further improve the stability of the temperature maintenance system software.

Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.

.Equipped with a temperature controller, platinum thermistor (pt10) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.

When leaving the factory, and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.


ZadarOil immersed transformer 50KVAHigh temperature treatment measures



It includes the performance and main uses of insulating layer materials,ZadarPrice of dry type transformer and oil immersed transformer, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard production process and quality standard of electromagnetic shielding.

The efficiency of transformer is closely related to the output power level of transformer. Generally, the greater the output power, the smaller the loss to output power ratio and the higher the efficiency. On the contrary, the lower the efficiency.

The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

Highly recommended.The dry-type transformer is composed of two winding resistances resulting in four wiring groups: & ldquo; y, Y & rdquo;, & ldquo; D,ZadarMaintenance of oil immersed transformer, Y & rdquo;, & ldquo; y, D & rdquo; and & ldquo; D, D & rdquo;. In China, only & ldquo; y, Y & rdquo; and & ldquo; y, D & rdquo; are selected. Because there are also two types of Y-connection with neutral line and without neutral line. If there is no neutral line, it will not be upgraded The letter N after the English letter Y indicates that the neutral line has transformer grounding wire. Yn0 wiring group, when UAB and UAB overlap, the minute hand points to 12. & ldquo; 12 & rdquo; in the new wiring group, it is indicated by & ldquo; 0 & rdquo.

Oil leakage at electric welding position

Loose core screw


ZadarOil immersed transformer 50KVAHigh temperature treatment measures



What about oil immersed transformer fire?

Quality documents.Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.

It should be said that after the development trend of these years, the overall level of China's transformer industry at this stage is basically international, and the quality level is no different from that of overseas goods& rdquo; The person in charge of the transformer Federation of China Household Appliance Industry Association said.

Oil leakage of porcelain pot and laminated glass oil level gauge

Zadar.When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.

Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.

The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.