Corpus Christi1250KW dry type transformerHave other basic functions and characteristics

announcer:hp122HP117294921 release time:2024-02-08 13:46:45

Equipped with a temperature controller, platinum thermistor (pt10) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.

Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.

Corpus Christi.Oil sample inspection & mdash; & mdash; the performance parameters such as compression resistance and residue shall be carried out every three years. The long-term overload or overload of the transformer can reduce the cycle time.

Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary,Corpus Christi10kV dry type power transformer, the load can be reduced or the operation of the transformer can be stopped.

.When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover,Corpus ChristiOil sample test of oil immersed transformer, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe, the tightening bolts are loose, and the installation and processing process is wrong so that the bolts are not tightened well, resulting in oil leakage.

The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.


Corpus Christi1250KW dry type transformerHave other basic functions and characteristics



The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, the disconnection component of the electric field is small.

During the operation of the transformer, the resistance value of the grounding wire shall be measured accurately every two years.

The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?

Honesty and mutual benefit.The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.

Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded,Corpus ChristiAutomatic power transmission of transformer, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min and the time interval of each closing shall not be less than 5min.


Corpus Christi1250KW dry type transformerHave other basic functions and characteristics



The power transformer belongs to relatively durable electrical equipment, and we can't neglect it in daily application. The common problems of power transformer conductor, power transformer winding and power transformer tapping power switch are analyzed below:

retailer.If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.

How to select dry-type transformer

The key reason for oil leakage is that there are defects in cast iron parts

Corpus Christi.Power transformer factory

Deterioration damage of transformer core insulation

Noise dispersion of dry-type transformer