Antsosin bondronaTransformer electrical testPrice is bullish

announcer:hp122HP117294921 release time:2024-01-28 17:54:08

Antsosin bondronaDry type transformer performance level code,

Oil leakage of cast iron parts

Before no-load impulse closing, the transformer shall be placed for 24h and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

Antsosin bondrona.Two point grounding device of iron core caused by residual welding scar;

Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, wind and sand.

.Connection group structure of dry-type transformer

Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.

(III) dry type transformers of 315KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than 5m; The distance between the electrified part and the road surface shall not be less than 5m.


Antsosin bondronaTransformer electrical testPrice is bullish



Fault judgment of power transformer

Power saving analysis of transformer

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface,Antsosin bondronaPrice of dry-type transformer,Antsosin bondronaOverload capacity and time of oil immersed transformer, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.

Superior quality.The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.

In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.


Antsosin bondronaTransformer electrical testPrice is bullish



The power transformer conductor refers to the connecting transmission line between each electromagnetic coil, between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.

Installation works.The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.

Visual inspection method for transformer inspection

Oil leakage of heat pipe radiator

Antsosin bondrona.How much is the power transformer

Dry type transformer manufacturer

Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.