Einfa Crohn10kV distribution transformerHow to produce

announcer:hp122HP117294921 release time:2024-01-20 09:34:39

When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.

When the full load test is carried out and everything is normal, large current flow and small characteristic impedance into high communication AC voltage, small current and large characteristic impedance. When there is an AC circuit in the original coil, the communication AC magnetic flux will be caused in the transformer core (or magnetic core),Einfa CrohnPower transformer fence regulations, causing the magnetic induction voltage in the primary coil (or current).

On load commissioning:

.Noise solution of dry-type transformer

Noise pollution control and prevention measures of dry-type transformer

After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.


Einfa Crohn10kV distribution transformerHow to produce



Power transformer plant

The fundamental reason for this kind of inaccuracy is that when the transformer & ldquo; Dalar trolley & rdquo; is considered according to the size of capacity utilization rate, the high-capacity transformer must be replaced by the small-capacity transformer with high utilization rate, and then the iron loss is considered and the copper loss is ignored. In fact for a certain load, the active power loss of small capacity exceeds that of large capacity The active power loss of the transformer, so it consumes electromagnetic energy.

The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.

equipment maintenance .Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.

The hanging core of dry-type transformer is a vital part

The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation,Einfa CrohnPrice of dry type transformer and oil immersed transformer, maintenance and transportation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.


Einfa Crohn10kV distribution transformerHow to produce



The voltage regulating tap changer is not in place or poor

Where to sell API.(II) the height width ratio of dry-type transformer pier installed on the ground is generally 0.5m,Einfa CrohnHow much is 315 box transformer, and a guardrail of no less than 7m shall be installed around it, and a warning sign shall be hung at a prominent position.

The selection shall be carried out according to the load characteristics of power. There are many types of power loads. Different dry-type transformers shall be used for different power loads. If the standard impulse level of power load is less than 150kV, class H dry-type transformers shall be used. If the standard impulse level of power load exceeds 150kV, epoxy resin adhesive shall be used to pour dry-type transformers.

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column but there are many calculation methods.