How to reduce the failure of dry-type transformer?

The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.

Jotbur.At rated power, the ratio of output power to input power of transformer is called the efficiency of transformer, i.e. & ETA; Is the efficiency of the transformer; P1 is the input power and P2 is the output power.

It includes the performance and main uses of insulating layer materials, various insulating layer parts,Jotbur315 KVA oil immersed transformer,JotburPower transformer price: 1000KVA, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip core stacking process and quality standard, production process and quality standard of electromagnetic shielding.

.The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.

The dry-type transformer is composed of two winding resistances, resulting in four wiring groups: & ldquo; y, Y & rdquo;, & ldquo; D, & ldquo; y, D & rdquo; and & ldquo; D, D & rdquo;. In China, only & ldquo; y, Y & rdquo; and & ldquo; y, D & rdquo; are selected. Because there are also two types of Y-connection with neutral line and without neutral line. If there is no neutral line, it will not be upgraded. All marks show that with neutral line, it will not be upgraded The letter N after the English letter Y indicates that the neutral line has transformer grounding wire. Yn0 wiring group, when UAB and UAB overlap, the minute hand points to 12. & ldquo; 12 & rdquo; in the new wiring group it is indicated by & ldquo; 0 & rdquo.

Oil leakage of heat pipe radiator


JotburElectronic changeIndustrial Digital Development System



The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.

The efficiency of transformer is closely related to the output power level of transformer. Generally, the greater the output power, the smaller the loss to output power ratio and the higher the efficiency. On the contrary, the smaller the output power, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.

Power transformer manufacturer


JotburElectronic changeIndustrial Digital Development System



Seal oil leakage

Quality assurance.Oil leakage at looper flange

Power saving analysis of transformer

After tightening the loose bolts seal the flange, and solve the bolts that are likely to leak,JotburTransformer power transmission, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.

Jotbur.Naturally, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.

After 24 hours of continuous trial operation with a certain load, and the transformer will turn to all normal operation.

After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.