St. Christopher630 oil immersed transformerProblem analysis summary

announcer:hp122HP117294921 release time:2023-12-24 09:22:01

The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.

Difference between dry-type transformer and oil immersed transformer:

St. Christopher.In fact,St. ChristopherPower recovery transformer, apart from the application of the Finance Bureau, the industry has been trying to formulate and upgrade transformer commodities according to the specifications, so as to promote the improvement of energy consumption level of transformer commodities.

Manufacturing process and steps of dry-type transformer

.The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?

A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.

Oil leakage of bolt or pipe external thread


St. Christopher630 oil immersed transformerProblem analysis summary



Loose core screw

Power saving analysis of transformers has always been based on whether the utilization rate of transformer capacity is less than a certain standard value. Whether transformers are environmental protection and energy saving specifications. In fact, sometimes such specifications are not saving electromagnetic energy, but consuming electromagnetic energy.

What is the reason for the shutdown of power transformer?

where.When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large,St. ChristopherPrinciple of power transformer, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.

Sound in case of phase failure

Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.


St. Christopher630 oil immersed transformerProblem analysis summary



Plug in the power with full load first, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

Quotation sheet.Before no-load impact closing,St. ChristopherPower transformer manufacturer, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.

With Vietnam and Malaysia, China's first UHV transmission experimental demonstration project, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world, occupying the main technical position of the industry development trend. In addition, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.

Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.

St. Christopher.Before application, the sampling container shall be cleaned with vehicle gasoline soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and the water can be evenly distributed from the bottle and then washed with tap water until it is not alkaline, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.

Operation of oil immersed transformer

& ldquo; YN, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at 12 o'clock, the phase voltage phasor of the secondary side is at 11 o'clock. That is, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).