PellilloElectrical equipment transformerThe dosage requirement

announcer:hp122HP117294921 release time:2023-12-21 12:55:42

Pellillo315 oil immersed transformer,

& ldquo; YN, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at 12 o'clock, the phase voltage phasor of the secondary side is at 11 o'clock. That is, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).

In the electric field of the winding to the yoke, there must be a strong line breaking component, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.

Pellillo.The rate of transformer is: n = P2 / p1x1o%, that is, when the copper loss of transformer is equivalent to iron loss, the rate is very large. Therefore, the load of transformer is: 0 = P / PK. Fully consider the active power loss caused by reactive power in the system software during transformer operation. The load adjustment is: it can be seen from the calculation of load formula that the large rate of transformer does not occur when the load is full, Generally, it is about 50%, but when selecting the transformer capacity, we should select effective transformers according to the load condition and load, so as to make the transformer in the situation of economic development and achieve the goal of power saving.

In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.

.When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.

If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for 100mm, stop the lifting, stabilize the bell cover,PellilloOil immersed experimental transformer, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.

It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires coil inductance process of various ways of electromagnetic coil,PellilloOil immersed high voltage test transformer, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.


PellilloElectrical equipment transformerThe dosage requirement



Operation and maintenance management of oil immersed transformer

The grounding resistance of, high voltage and bottom voltage shall not be less than 70% (10m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed 2%, which shall not exceed 2% compared with the last accurate measurement result.

Power transformer manufacturer

Price.The whole process of hanging the core of dry-type transformer is more critical and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, so as to promote the safety of dry-type transformer!

The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.


PellilloElectrical equipment transformerThe dosage requirement



Oil immersed transformer company

Information recommendation.When the transformer is out of phase, if the second phase is blocked there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:

In order to better avoid overvoltage damage, a group of overvoltage maintenance high-voltage Arresters (such as y4cs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.

The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, which are called test power transformers. They can be divided into inflatable, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.