Arjonah15KVA control transformerCategory single chemical composition range

announcer:hp122HP117294921 release time:2023-12-21 09:30:23

For the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents, power failure, damage to machinery and equipment, etc.

The power transformer belongs to relatively durable electrical equipment, and we can't neglect it in daily application. The common problems of power transformer conductor power transformer winding and power transformer tapping power switch are analyzed below:

Arjonah.Automatic system of centrifugal fan: measure the temperature data signal according to the PT100 thermistor temperature measuring resistor of the embedded parts at the hot part of the bottom pressure winding. The transformer load expands and the operating temperature increases. When the winding temperature reaches 110 ℃, the system software automatically starts the centrifugal fan for refrigeration; When the winding temperature is as low as 90 ℃, the system software will automatically terminate the centrifugal fan.

Oil immersed transformer company

.Oil immersed transformer operation

Wiring mode of dry-type transformer:

When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation, and long-term scalding of iron core will lead to insulation aging.


Arjonah15KVA control transformerCategory single chemical composition range



When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, apart from the application of the Finance Bureau, the industry has been trying to formulate and upgrade transformer commodities according to the specifications,ArjonahPower transformer 2, so as to promote the improvement of energy consumption level of transformer commodities.

The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is the disconnection component of the electric field is small.

Arjonah.The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms,ArjonahHow much is a 200 KVA box transformer, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.

Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.