CaucasusDry type transformer model scb10Selection of storage place

announcer:hp122HP117294921 release time:2023-12-19 09:22:51

What about oil immersed transformer fire?

The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, which is conducive to adjusting the data and has a unique and neat style.

Caucasus.At that time, only a few companies in China could produce 500kV high-voltage transformers,CaucasusWhich is a good oil immersed power transformer, and the market share of high-voltage transformers was basically monopolized by overseas leaders.

Dry type transformer manufacturer

.Operation of oil immersed transformer

The capacity and working voltage are different. The dry-type transformer is generally suitable for distribution equipment. The capacity is generally below 2000kVA and the working voltage is below 35KV, which also ensures the rated voltage of 110kV; Oil immersed transformers are generally suitable for distribution equipment.

The whole process of hanging the core of dry-type transformer is more critical, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!


CaucasusDry type transformer model scb10Selection of storage place



Generally speaking, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer, disconnect the switching power supply on each side, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.

Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.

The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by 20%.

production.The power transformer conductor refers to the connecting transmission line between each electromagnetic coil, and between the electromagnetic coil and the tap changer.

(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

The input and output three-phase power lines shall be connected to phase a,CaucasusHow much is 200 KVA oil transformer, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.


CaucasusDry type transformer model scb10Selection of storage place



Deterioration damage of transformer core insulation

Quality inspection report.& ldquo; YN, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at 12 o'clock, the phase voltage phasor of the secondary side is at 11 o'clock. That is, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).

In fact,Caucasus2000 KVA dry type transformer, apart from the application of the Finance Bureau, the industry has been trying to formulate and upgrade transformer commodities according to the specifications so as to promote the improvement of energy consumption level of transformer commodities.

Different diversion methods, dry-type transformers mostly use silica gel waterproof casing, while oil transformers mostly use porcelain waterproof casing;

Caucasus.Careless maintenance and insulation damage

Oil leakage at looper flange

The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!