Manufacturing process and steps of dry-type transformer

Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration,OhtirkaCan oil immersed transformers be located underground, the bottle cap shall be tightly closed and cannot be opened before application.

Ohtirka.Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.

The power transformer conductor refers to the connecting transmission line between each electromagnetic coil, between the electromagnetic coil and the group outlet pipe and between the electromagnetic coil and the tap changer.

.High voltage fuse of transformer breaks one phase;

If the above provisions are not met, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N2 shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.

When the full load test is carried out and everything is normal, the load can be connected.


OhtirkaPrice of oil immersed transformerCompany production



The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.

Good quality.Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.

When checking the hook core, the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken if you work again, turn on the photo flash when it's light, and it's short when it's heavy. Therefore, experts can inspect special tools, parts, insulation, etc. and deliver them after they are determined to be complete and reliable.

When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.


OhtirkaPrice of oil immersed transformerCompany production



After 24 hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.

Packaging strategy.The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?

The iron loss of transformer includes two levels. The first is the hysteresis loss introduced by the transformer manufacturer. When the AC circuit is based on the transformer,OhtirkaDry type transformer test, according to the magnetic induction line of the transformer ferrite core, its orientation and size change with the change, which promotes the internal molecular structure of the ferrite core to interact with each other,OhtirkaBox type transformer room, releases energy, and then loses part of electromagnetic energy, which is the hysteresis loss. The other is the vortex loss when the transformer is working.

When the manufacturer of the power transformer samples from the automobile oil tank, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe,

Ohtirka.The key reason for oil leakage is that there are defects in cast iron parts

The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding, needle holes, and the potential safety hazards are exposed after operation. In addition the electromagnetic induction vibration will crack the electric welding and lead to leakage.

The key reason for oil leakage is that there are defects in cast iron parts