Carmen JaneTechnology of oil immersed transformerApplication in parts processing

announcer:hp122HP117294921 release time:2023-12-04 14:29:40

or between electromagnetic coil

The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, i.e. insulation spacing.

Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.

Carmen Jane.The visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find the abnormal conditions of the equipment, such as discoloration, deformation, offset, cracking, loosening, ignition smoke, oil leakage, broken strand disconnection, short-circuit fault marks, hanging of dirty things etching and turbidity, visual inspection is one of the common methods of equipment inspection.

How to reduce the failure of dry-type transformer?

.Then clamp the branch pipe with your thumb,Carmen JanePower transformer oil immersed, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.

When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, and each module is replaced by an equivalent circuit, and its power circuit includes an inductance and vertical capacitance, a capacitance to ground or capacitance between windings, They also have mutual inductors between the inductors of each module, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.

After 24 hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.


Carmen JaneTechnology of oil immersed transformerApplication in parts processing



Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition,Carmen JaneTechnical performance table of dry type transformer, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.

There is a magnetic induction line crossing in the transformer core,Carmen JaneOil type power transformer, which will cause induced electromotive force on the plan with the magnetic induction line. Because this electric flow creates a closed loop to generate an electric field and forms a vortex, it is called vortex. The existence of vortex makes the transformer core hot and consumes kinetic energy. This kind of loss is called vortex loss.

When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.

Installation requirements.Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.

The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.

The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.


Carmen JaneTechnology of oil immersed transformerApplication in parts processing



The power transformer conductor refers to the connecting transmission line between each electromagnetic coil, between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.

Latest quotation.Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.

The insulation of the through core anchor bolt clamping the iron core is damaged, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;

When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?

Carmen Jane.The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?

The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by 20%.

Noise pollution control and prevention measures of dry-type transformer