Copenhagen1250 dry type transformer sizeEffective treatment method

announcer:hp122HP117294921 release time:2023-10-20 21:36:51

Dry type transformer

Oil leakage of bolt or pipe external thread

Copenhagen.The step-up dry-type transformer refers to the instantaneous operation of voltage. At this stage, there are few manufacturers of dry-type transformer that can reasonably guarantee the instantaneous step-up in China. The step-up dry-type transformer has strong step-up capacity and good practical effect. The difference depends on that the transformer power switch without excitation regulator does not have the ability to change gear with load. Because this kind of tap power switch can cut off the whole process in a short time during the whole process of gear change, cutting off the load current will cause arc burning between circuit breakers, tap power on and off or short circuit fault, so the dry-type transformer shall be powered off during regulation. Therefore, it is generally used as a dry-type transformer that is not very strict in voltage regulation and does not need to be adjusted frequently.

The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.

.The flange surface is uneven, the tightening bolts are loose,CopenhagenAll transformers, and the installation and processing process is wrong, so that the bolts are not tightened well, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.


Copenhagen1250 dry type transformer sizeEffective treatment method



Power transformer manufacturer

The selection shall be carried out according to the load characteristics of power. There are many types of power loads. Different dry-type transformers shall be used for different power loads. If the standard impulse level of power load is less than 150kV,CopenhagenDry type 1250kva transformer, class H dry-type transformers shall be used. If the standard impulse level of power load exceeds 150kV, epoxy resin adhesive shall be used to pour dry-type transformers.

High voltage fuse of transformer breaks one phase;

Welcome to inquire.When the transformer is out of phase, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:

On load commissioning:

The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.


Copenhagen1250 dry type transformer sizeEffective treatment method



The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

retailer.In relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point, it will affect the whole power circuit

A kind of power engineering equipment that converts the working voltage and current according to the basic law of magnetic effect of current. In the whole process of power transmission and transformation of power engineering, it is necessary to carry out voltage transformation and blood pressure reduction according to the transformer to reduce the loss of electromagnetic energy in the whole process. Therefore, the power consumption of the processing plant is all connected with 10kV switching power supply, which is converted into bottom voltage electromagnetic energy through transformer.

The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?

Copenhagen.There are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.

When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.

The power transformer conductor refers to the connecting transmission line between each electromagnetic coil between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.