ZaventumTemperature standard for oil immersed transformersThe main factor of price

announcer:hp122HP117294921 release time:2023-08-28 21:11:51

During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.

Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.

Zaventum.Transformer

After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.

.The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.

Naturally, if the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.

The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).


ZaventumTemperature standard for oil immersed transformersThe main factor of price



In order to better carry out the experiment of power transformer oil,ZaventumHow much is a 100 KVA box transformer, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.

How to select dry-type transformer

The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity,ZaventumDifference between dry-type transformer and oil immersed transformer, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.

Before no-load impulse closing, the transformer shall be placed for 24h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

Wiring mode of dry-type transformer:


ZaventumTemperature standard for oil immersed transformersThe main factor of price



Oil immersed transformer operation

offer.If the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard the fire brigade must be notified.

After the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:

Oil immersed transformer company

Zaventum.The switching power supply lacks one phase of power;

After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.

Analysis of common faults of oil immersed transformer: