VirginiaWaste transformerMatters needing attention in hot weather

announcer:hp122HP117294921 release time:2024-08-09 12:28:21

(II) the height width ratio of dry-type transformer pier installed on the ground is generally 0.5m, and a warning sign shall be hung at a prominent position.

The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

Virginia.When the output power P2 of the transformer is equivalent to the input power P1, the efficiency & ETA; Equivalent, the transformer will not cause loss. But in fact, part of the electromagnetic energy changes into energy and is lost. Because the electromagnetic coil is generally wound by copper core wire with insulating layer, it is called copper loss.

How much is the power transformer

.There are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.

When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate) it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.

The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?


VirginiaWaste transformerMatters needing attention in hot weather



The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

The dry-type transformer used for power plant voltage transformation is different from the oil transformer. It is strictly prohibited to lead the way at the bottom voltage side to prevent the insulation layer of the dry-type transformer from penetrating due to overvoltage caused by overvoltage at the power grid side or lightning stroke on the line.

With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.

assets.Power transformers are used in all walks of life

Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, insulated by insulating oil in the circulating system inside the transformer, and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.

Analysis of common faults of oil immersed transformer:


VirginiaWaste transformerMatters needing attention in hot weather



The switching power supply lacks one phase of power;

offer.Seal oil leakage

Power transformer is indispensable for power stations and substations, but we must pay attention to many problems in the whole process of applying power transformer.

(IV) the transformer on the column shall be stable and firm,VirginiaQuotation for 2500kVA dry type transformer,VirginiaOil immersed main transformer, and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

Virginia.The hanging core of dry-type transformer is a vital part

Falling foreign matters and piercing

The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!