Samarkand660V to 380V three-phase transformerThe development of the industrial market will tend to grow steadily

announcer:hp122HP117294921 release time:2024-07-17 09:15:26

Falling foreign matters and piercing

The dry-type transformer is composed of two winding resistances, resulting in four wiring groups: & ldquo; y, & ldquo; D, Y & rdquo;, & ldquo; y,SamarkandTransformer price of 1000 KVA,SamarkandSpecification for oil immersed transformers, D & rdquo; and & ldquo; D, only & ldquo; y, Y & rdquo; and & ldquo; y, D & rdquo; are selected. Because there are also two types of Y-connection with neutral line and without neutral line. If there is no neutral line,SamarkandPower high voltage transformer, it will not be upgraded. All marks show that with neutral line, it will not be upgraded The letter N after the English letter Y indicates that the neutral line has transformer grounding wire. Yn0 wiring group, when UAB and UAB overlap the minute hand points to 12. & ldquo; 12 & rdquo; in the new wiring group, low noise fire safety and explosion-proof and high reliability. There are two key development prospects: one is the development trend of high voltage and high voltage, especially 750kV and 1100kV. The second is the development trend towards environmental protection, energy conservation and miniaturization. The former key is applied to the long-distance substation project route, and the latter key is applied to the substation project route in big cities.

Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.

.The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the 45 degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.

Due to poor sealing, generally, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.

After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.


Samarkand660V to 380V three-phase transformerThe development of the industrial market will tend to grow steadily



Analysis of common faults of oil immersed transformer:

If the input of dry-type transformer is an alternating switching power supply, its output voltage is directly proportional to the coil turn ratio of the output input solenoid coil. If a rechargeable battery is used, because it is DC, add a circuit in the input power supply circuit to change it into a continuously changing voltage. In that way the alternating DC current can be obtained at the output end.

Power transformer plant

Bidding.Oil leakage at looper flange

In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg and the oil sample for simplified experiment shall not be less than 1kg.

Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.


Samarkand660V to 380V three-phase transformerThe development of the industrial market will tend to grow steadily



The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.

Recommendation and consultation.When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules, and each module is replaced by an equivalent circuit, and its power circuit includes an inductance and vertical capacitance, a capacitance to ground or capacitance between windings, They also have mutual inductors between the inductors of each module, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.

It is understood that in China, transformers have experienced the whole process of replacing many series products such as sss11. As early as the middle and late 1980s, S7 Series lossless distribution transformers were selected in China to replace the high energy consumption transformers of jb1300-73 and jb500 - Specifications operating in the power network at that time. Since the 19th century, urban power grids have been transformed all over the country, and S9 series distribution transformers have been used to replace S7 Series. In recent years, S13 and S15 commodities are gradually selected in large quantities in the transformation of urban and rural power networks in China, and their full load loss is 50% - 80% less than that of S9 transformer.

When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.

Samarkand.Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.

When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).