TabosharOil immersed regulator manufacturerHow to deal with appearance

announcer:hp122HP117294921 release time:2024-07-14 12:11:09

Performance and main parameters of common metal composites, various welding processes and machinery and equipment, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology, copper, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, machinery and equipment of each process flow; The natural working environment is basically regulated.

Operation of oil immersed transformer

Taboshar.First of all, although dry-type transformer has strong moisture resistance, it is generally open structure or very susceptible to moisture, especially the insulation level of dry-type transformer manufactured in China is low (lower flame retardant grade) Therefore, the dry-type transformer can obtain high stability only when the air humidity is below 70%. The dry-type transformer shall also be prevented from stopping operation for a long time to prevent serious damp. When the grounding resistance value is less than 1000 / V (operating voltage), it indicates that the transformer is seriously damp, and the trial operation shall be terminated.

In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.

.The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.

The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.

Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.


TabosharOil immersed regulator manufacturerHow to deal with appearance



Oil immersed transformer company

The visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find the abnormal conditions of the equipment, such as discoloration, deformation offset,TabosharBox type transformer, cracking, loosening, ignition smoke oil leakage, broken strand disconnection, short-circuit fault marks, hanging of dirty things, etching and turbidity, which can be inspected according to the visual inspection method. Therefore, visual inspection is one of the common methods of equipment inspection.

For 630kVA power engineering transformer, plastic parts are selected in the middle of iron core clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.

market.35kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.

When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time,TabosharDry type test transformer, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.

(III) dry type transformers of 315KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than 5m; The distance between the electrified part and the road surface shall not be less than 5m.


TabosharOil immersed regulator manufacturerHow to deal with appearance



From the appearance, the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, and only the shell can be seen for oil immersed transformer;

Good reputation.Before and after sampling, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.

The main reason is that the welding quality of electric welding is poor, open welding, needle holes, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.

Taboshar.For no-load impulse closing of transformer, pay attention to the following matters:

The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, the closing shall be maintained by high-voltage arrester and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below 0.2%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.