The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.

Putaran.Oil sample inspection & mdash; & mdash; the performance parameters such as compression resistance and residue shall be carried out every three years. The long-term overload or overload of the transformer can reduce the cycle time.

The power transformer belongs to relatively durable electrical equipment, and we can't neglect it in daily application. The common problems of power transformer conductor, power transformer winding and power transformer tapping power switch are analyzed below:

.When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.

Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound,PutaranBox type transformer recycling manufacturer, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

Common problems of tap changer of power transformer


PutaranS13 power oil immersed transformerWhy need reinforcement



Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil,PutaranWhat is the starting temperature of dry-type transformer fan, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

Step up process of dry-type transformer?

It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.

Create brilliance.Oil leakage of cast iron parts

Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut) wipe the Fushi blue film remover on the surface, the treatment goal can be achieved.


PutaranS13 power oil immersed transformerWhy need reinforcement



When the full load test is carried out and everything is normal, the load can be connected.

production.Oil immersed transformer operation

Transformer is

Dry type transformer manufacturer

Putaran.After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.

(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

& ldquo; YN, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand, the phase voltage phasor of the secondary side is at 11 o'clock. That is, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).