FukuyamaStandard for AC withstand voltage test of power transformerThings to pay attention to when buying

announcer:hp122HP117294921 release time:2024-07-03 14:20:41

Operation of oil immersed transformer

For the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents, power failure,FukuyamaPower electronic control,FukuyamaDry type transformer of power plant, damage to machinery and equipment, etc.

Fukuyama.At that time only a few companies in China could produce 500kV high-voltage transformers, in the 1970s, the radio programs applied by every family in the countryside had a ground wire, and they were often wet with tap water. Protective grounding is to bury the copper plate of metal electrical conductor in the soil layer, and then lead a point of it out of the road with transmission line, which completes the grounding protection. The grounding wire specifies the grounding wire resistance ≤ 4Ω. Grounding protection is a safeguard measure adopted to avoid safety accidents when using household appliances, office and other electrical equipment.

When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.

The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.


FukuyamaStandard for AC withstand voltage test of power transformerThings to pay attention to when buying



The switching power supply lacks one phase of power;

The iron loss of transformer includes two levels. The first is the hysteresis loss introduced by the transformer manufacturer. When the AC circuit is based on the transformer, according to the magnetic induction line of the transformer ferrite core, which promotes the internal molecular structure of the ferrite core to interact with each other, releases energy, and then loses part of electromagnetic energy, which is the hysteresis loss. The other is the vortex loss when the transformer is working.

After 24 hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.

Customer first.(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!

For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.


FukuyamaStandard for AC withstand voltage test of power transformerThings to pay attention to when buying



After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit and adjust the overcurrent protection value.

Where can I find it?.What is the important role of power transformer

Protection mode for type selection of dry-type test transformer

In specific daily life, oil immersed transformers are released outward in the form of waves. This kind of wave is like a tide. It is also a kind of kinetic energy. In fact, computer automatic system is used to control the wavelength and frequency of electromagnetic wave. The longer the light wavelength is, the greater the output power is. On the contrary, it is very small.

Fukuyama.For example in the 1970s, the radio programs applied by every family in the countryside had a ground wire,FukuyamaPrice of dry-type transformer 2500, and they were often wet with tap water. Protective grounding is to bury the copper plate of metal electrical conductor in the soil layer, and then lead a point of it out of the road with transmission line, which completes the grounding protection. The grounding wire specifies the grounding wire resistance ≤ 4Ω. Grounding protection is a safeguard measure adopted to avoid safety accidents when using household appliances, office and other electrical equipment.

The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

What is the wiring mode of dry-type transformer?