PaseRecovery price of dry-type transformerCauses of market volatility

announcer:hp122HP117294921 release time:2024-06-30 18:06:48

Causes of fire in power transformer

When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.

Pase.Right, as & ldquo; Great Lars car & rdquo;, After replacing one 255kva small transformer, the utilization rate is close, but the main parameters of the two transformers are evaluated as shown in Table 1. Table 1 evaluates the main parameters of the transformer: capacity (VA) iron loss (W) copper loss (W). Firstly, the output power is saved according to the customary calculation method (ignoring copper loss): the results show that the loss of large capacity transformer is lower than that of small capacity transformer It actually consumes electromagnetic energy.

Operation of oil immersed transformer

.After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.

On load commissioning:


PaseRecovery price of dry-type transformerCauses of market volatility



What is the important role of power transformer

Dry type transformer, a static electrical equipment is used to change the AC current (current) of a certain standard value into another or several types of working voltage (current) with the same frequency and different standard values. According to the supervision sampling inspection data of the third quarter of last year released by AQSIQ, among the 29 kinds of dry-type transformer commodities manufactured by 29 manufacturers in 12 provinces and municipal districts across the country, 6 kinds of commodities were found to be inconsistent with the provisions of relevant specifications,PaseS11 technical parameters of power transformer, with a compliance rate of 80%& ldquo; This result mostly shows the quality level of China's dry-type transformer industry at the present stage.

Wiring mode of dry-type transformer:

plan.The hanging core of dry-type transformer is a vital part

In terms of the place of use, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, and most application places leading to fire accidents are easy to choose in large and medium-sized engineering buildings and multi-storey buildings;

What is the reason for the shutdown of power transformer?


PaseRecovery price of dry-type transformerCauses of market volatility



After no-load test run is normal for 24h,Pase35kV energy saving power transformer, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

market.The hanging core of dry-type transformer is a vital part

How to select dry-type transformer

After no-load test run is normal for 24h,PaseAutomatic power transmission of transformer, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

Pase.The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; 0” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.

After 24 hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.

Falling foreign matters and piercing