LuoyangOverload capacity and time of oil immersed transformerMarket supply maintains tight balance

announcer:hp122HP117294921 release time:2024-06-27 22:58:52

What is the important role of power transformer

What about oil immersed transformer fire?

Luoyang.At that time, only a few companies in China could produce 500kV high-voltage transformers and the market share of high-voltage transformers was basically monopolized by overseas leaders.

Brief introduction of zero line of power transformer

.The power transformer conductor refers to the connecting transmission line between each electromagnetic coil, between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.

Dry type transformer

The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by 20%.


LuoyangOverload capacity and time of oil immersed transformerMarket supply maintains tight balance



After no-load test run is normal for 24h, and the load shall be gradually increased from 25%, 50% and 75% by grade.

The common dry-type transformer is an important electrical equipment, and the voltage is constantly regulated. However,LuoyangTransformer power transmission, because of certain necessity, and the whole process of boosting voltage is very complex, and there are many principles.

Dry type transformer manufacturer

Work courses.After the test, connect the data signal contact of the automobile relay with the alarm circuit,LuoyangDistribution transformer experiment, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.

In relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point, it will affect the whole power circuit

Operation of oil immersed transformer


LuoyangOverload capacity and time of oil immersed transformerMarket supply maintains tight balance



After sampling, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.

Principle of step-up dry-type transformer: the step-up dry-type transformer is a component that correspondingly converts low communication AC voltage, large current flow and small characteristic impedance into high communication AC voltage,LuoyangDo dry-type transformers have fans, small current and large characteristic impedance. When there is an AC circuit in the original coil the communication AC magnetic flux will be caused in the transformer core (or magnetic core), causing the magnetic induction voltage in the primary coil (or current).

Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer causing the ignition of the casing, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.

Luoyang.In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.

The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

Oil leakage of bolt or pipe external thread