Port AyacuchoPrimary energy efficiency model of dry-type transformerOperation precautions

announcer:hp122HP117294921 release time:2024-06-23 15:26:55

During no-load test run the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.

Difference between dry-type transformer and oil immersed transformer:

Port Ayacucho.The insulation of the through core anchor bolt clamping the iron core is damaged, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;

Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.

.Noise solution of dry-type transformer

Caused by sand holes and cracks. For crack leakage,Port AyacuchoEfficiency of power transformer, drilling stop hole is a good way to remove in-situ stress and prevent widening.

The voltage regulating tap changer is not in place or poor


Port AyacuchoPrimary energy efficiency model of dry-type transformerOperation precautions



Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below 0.2%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.

The secondary inductive equipment of the distribution station (such as transformer, automobile relay, AC, etc.) operates normally. According to the AC current, the winding transformer core will send out a symmetrical rhythm and a certain tone & ldquo; Buzz, buzz & rdquo; Sound. The operation staff of the transformer manufacturer should understand and grasp the characteristics of the noise. When the equipment has common faults there will be noise and even & ldquo; Crackle & rdquo; The charging and discharging sound can distinguish the generation and characteristics of common equipment faults according to the music law and sound transformation when everything is normal and abnormal.

Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes,Port AyacuchoOil immersed box transformer, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

Quality assurance.Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.

There are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.

Caused by sand holes and cracks. For crack leakage, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.

average method.In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.

It is understood that in China, S7 Series lossless distribution transformers were selected in China to replace the high energy consumption transformers of jb1300-73 and jb500 - Specifications operating in the power network at that time. Since the 19th century, urban power grids have been transformed all over the country, and S9 series distribution transformers have been used to replace S7 Series. In recent years, S13 and S15 commodities are gradually selected in large quantities in the transformation of urban and rural power networks in China,Port AyacuchoPower transformer function, and their full load loss is 50% - 80% less than that of S9 transformer.

If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.

Port Ayacucho.Power transformers are used in all walks of life

If the volume of power transformer is too small the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.

Oil leakage of bolt or pipe external thread