Sinaga160KV oil immersed transformerHow to solve the unstable speed

announcer:hp122HP117294921 release time:2024-06-19 13:53:28

After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.

For the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents, power failure damage to machinery and equipment, kW. Active power loss of small capacity transformer: when a pump room is in normal operation etc.

Sinaga.The appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer, two pumps are started separately, and each pump is driven by 100kW motor, so the usual load is 200 KW, CST = 0. One 750kva transformer was originally configured, and the capacity utilization rate introduced by the transformer manufacturer is only 34%

Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

.When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.

Fault judgment of power transformer

In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.


Sinaga160KV oil immersed transformerHow to solve the unstable speed



The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

Step up process of dry-type transformer?

Dry type transformer manufacturer

reform.Dry type transformer manufacturer

The noise of dry-type transformer comes from

The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of 0.5kg or 1kg. 2-3 bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source,Sinaga1250KW dry type transformer, sampling date, sampling person, weather conditions and other materials of the oil sample.


Sinaga160KV oil immersed transformerHow to solve the unstable speed



There are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.

Quality assurance.The voltage regulating tap changer is not in place or poor

Power transformer is indispensable for power stations and substations, but we must pay attention to many problems in the whole process of applying power transformer.

What is the important role of power transformer

Sinaga.The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance,SinagaParameters of 1250kva oil immersed transformer, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; 0” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.

For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, the goal of long-term treatment of leakage can be achieved.

The hanging core of dry-type transformer is a vital part