ShafhausenHow much is a 250kVA box transformerWhat problems are encountered in use

announcer:hp122HP117294921 release time:2024-06-11 09:43:51

When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.

Power transformers are also used for testing, which are called test power transformers. They can be divided into inflatable, oil transformer, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.

Shafhausen.The top and middle of the transformer oil tank, the flange plate, barrel skin and the middle of the waterproof sleeve at the upper end of the automobile oil tank. The internal iron core and winding clamp are hot due to partial magnetic leakage, resulting in insulation damage.

Oil leakage of heat pipe radiator

.The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground,ShafhausenInsulation grade of oil immersed transformer, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.

Power transformer plant

What is the important role of power transformer


ShafhausenHow much is a 250kVA box transformerWhat problems are encountered in use



In the case of dry-type transformer operation, there is more noise, and some even cause noise, which seriously endangers everyone's no problem rest time and work. At this time the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.

The cycle time of power-off cleaning and inspection shall be determined according to the surrounding environment and load conditions, generally from half a year to once a year;

The input and output three-phase power lines shall be connected to phase a phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.

The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min, and the time interval of each closing shall not be less than 5min.

The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min, and the time interval of each closing shall not be less than 5min.


ShafhausenHow much is a 250kVA box transformerWhat problems are encountered in use



What is the wiring mode of dry-type transformer?

Product survey.The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

The insulation of the through core anchor bolt clamping the iron core is damaged, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;

When sampling in bulk gasoline barrels,ShafhausenDistribution transformer recovery, samples shall be selected according to 5% of the number of gasoline barrels, but not less than 2 barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to 2% of the total number of barrels (bottles).

Shafhausen.During no-load test run,ShafhausenQuotation for 2500kVA dry type transformer, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.

A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?

After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.