WarsawOil immersed transformer temperatureCategory price correlation regression

announcer:hp122HP117294921 release time:2024-06-01 19:59:23

The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct,WarsawDry type 1250kva transformer, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by 20%.

Protective measures for damping of dry-type transformer

Warsaw.First of all, although dry-type transformer has strong moisture resistance, it is generally open structure or very susceptible to moisture, especially the insulation level of dry-type transformer manufactured in China is low (lower flame retardant grade) Therefore, the dry-type transformer can obtain high stability only when the air humidity is below 70%. The dry-type transformer shall also be prevented from stopping operation for a long time to prevent serious damp. When the grounding resistance value is less than 1000 / V (operating voltage), it indicates that the transformer is seriously damp, and the trial operation shall be terminated.

Falling foreign matters and piercing

.The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.

The flange surface is uneven, the tightening bolts are loose,WarsawLarge oil immersed transformer, and the installation and processing process is wrong, resulting in oil leakage.

Oil immersed transformer


WarsawOil immersed transformer temperatureCategory price correlation regression



The voltage regulating tap changer is not in place or poor

Visual inspection method for transformer inspection

Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

Inspection standard.Oil leakage of heat pipe radiator

& ldquo; YN, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line as the minute hand, refers to the position at 12 o'clock, the phase voltage phasor of the secondary side is at 11 o'clock. That is, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).

After 24 hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.


WarsawOil immersed transformer temperatureCategory price correlation regression



Dry type transformer manufacturer

Excellent service.In fact, ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, safety factor grounding device can be divided into grounding protection anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.

How to maintain dry-type transformer?

A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable,WarsawCooling mode of power transformer, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.

When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.

Dry type transformer factory