Hu MingTransformer power transmission and ignitionInfluencing factors of price

announcer:hp122HP117294921 release time:2024-05-22 10:18:45

The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.

Under normal conditions,Hu Ming4000kva power transformer, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.

Hu Ming.Power saving analysis of transformers has always been based on whether the utilization rate of transformer capacity is less than a certain standard value. Whether transformers are environmental protection and energy saving specifications. In fact, sometimes such specifications are not saving electromagnetic energy, but consuming electromagnetic energy.

(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

.Deterioration damage of transformer core insulation

Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.

When the full load test is carried out and everything is normal, the load can be connected.


Hu MingTransformer power transmission and ignitionInfluencing factors of price



After no-load test run is normal for 24h, it can be transferred to on-load operation, and the load shall be gradually increased from 25%, 50% and 75% by grade.

The insulation of the through core anchor bolt clamping the iron core is damaged resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;

The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation,Hu MingBox type transformer, and overload is not allowed in the whole process of operation.

Bidding.The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer,Hu MingDimensions of 1600KVA oil immersed transformer, and the vibration reduction solution is made at the cable bridge.

In the case of dry-type transformer operation, there is more noise, and some even cause noise, which seriously endangers everyone's no problem rest time and work. At this time, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:

Performance and main parameters of common metal composites common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, various welding processes and machinery and equipment, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser, coupling and oil storage tank cabinet, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, machinery and equipment of each process flow; The natural working environment is basically regulated.

Hu Ming.If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

The manufacturing process of dry-type transformer is very process, and must be technically as a certain pillar. Only in that way, the performance of dry-type transformer will be more stable. What are the common manufacturing processes and steps of dry-type transformer?

A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.