& ldquo; YN, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand refers to the position at 12 o'clock, the phase voltage phasor of the secondary side is at 11 o'clock. That is the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).

Dry type transformer factory

San Diego Las Vegas.The person in charge of a transformer manufacturer said that because of the hazards of raw materials and other factors, the cost of energy-saving transformers is significantly higher than that of traditional transformers, and the price factor is also a key factor endangering the popularization and marketing of energy-saving transformers. Although there are energy-saving and convenient subsidy projects to help energy-saving transformers, the market has not yet fully operated.

The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!

The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, maintenance and transportation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.

Operation and maintenance management of oil immersed transformer


San Diego Las VegasHow much is 2500 dry-type transformerRoad of specialization



Performance and main parameters of common metal composites, various welding processes and machinery and equipment, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology, surface treatment process and quality standards, copper, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, machinery and equipment of each process flow; The natural working environment is basically regulated.

Transformer inspection ear

Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.

assets.Careless maintenance and insulation damage

Different diversion methods, dry-type transformers mostly use silica gel waterproof casing, while oil transformers mostly use porcelain waterproof casing;

Therefore, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.


San Diego Las VegasHow much is 2500 dry-type transformerRoad of specialization



When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.

Highly recommended.Fault judgment of power transformer

The transformer manufacturer shall not use hand touch method to detect energized high-voltage equipment, such as transformer in operation and neutral grounding equipment of arc suppression coil. For the equipment without power supply and whose shell is reliable grounding device, the temperature or temperature rise must be tested by hand. The secondary equipment can be inspected by hand touch method when it is hot and vibrated.

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked,San Diego Las Vegas1600KVA box transformer price, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:

San Diego Las Vegas.The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.

There are many connection groups of dry-type transformers, and the selected structures and connections are also different. Then, what are the groups of dry-type transformers? How to carry out the connection? Or basically introduce it with the network of dry-type transformer manufacturers.

Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition,San Diego Las VegasHow much is a 50 KVA box transformer, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.