Power transformer manufacturer

The key reason for oil leakage is that there are defects in cast iron parts

Buick Tamil.The transformer manufacturer shall not use hand touch method to detect energized high-voltage equipment, such as transformer in operation and neutral grounding equipment of arc suppression coil. For the equipment without power supply and whose shell is reliable grounding device the temperature or temperature rise must be tested by hand. The secondary equipment can be inspected by hand touch method when it is hot and vibrated.

In the case of using dry-type transformer, customers must master the method of wiring. If there are problems in wiring, it is easy to cause common faults in application. So, what is the wiring mode of dry-type transformer?

.Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.

If the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard the fire brigade must be notified.

It will also produce many faults, effectively deal with various faults of oil immersed transformer, make full use of the performance indicators and advantages of oil immersed transformer, and short-circuit fault is more general.


Buick TamilPrice of 2000 KVA dry type transformerWorking environment and failure mode



Oil immersed transformer company

The insulation of the through core anchor bolt clamping the iron core is damaged, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;

The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.

Customer first.The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ 4Ω,Buick TamilThree phase dry AC transformer, The resistor is generally more than 2000 & omega;, According to Ohm's law, when the insulating layer is damaged,Buick TamilDry type 1250kva transformer, the current is only 1 / 500 of the total current flow,Buick TamilOil immersed high voltage test transformer, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.

The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.

Oil leakage of cast iron parts


Buick TamilPrice of 2000 KVA dry type transformerWorking environment and failure mode



The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at 12 o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.

Application process.Oil leakage at electric welding position

The equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing, remove and replace the cracked or brittle leather pad, check and tighten the node, replenish the oil with less oil, check and replace the silica gel of the breathing mask, etc.

& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short, and long-term scalding of iron core will lead to insulation aging.