Eravur townScb13-1250kva dry type transformerBrand strategy is the key to improving competitiveness

announcer:hp122HP117294921 release time:2024-04-09 13:13:58

Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.

From the appearance, and only the shell can be seen for oil immersed transformer;

Eravur town.Transformer inspection nose sniffing method

When checking the hook core the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken,Eravur townDry type transformer temperature, if you work again, turn on the photo flash when it's light, and it's short when it's heavy. Therefore, please pay attention during maintenance. It is not necessary to destroy the insulation. After maintenance, experts can inspect special tools, parts, insulation, etc. and deliver them after they are determined to be complete and reliable.

.With the rapid development of society and the continuous development trend of computers, the accuracy of calculation conclusions can meet the needs of architectural design,Eravur townPower supply transformer S11, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.

Fault judgment of power transformer

There are many connection groups of dry-type transformers, and the selected structures and connections are also different. Then,Eravur townOil immersed transformer oil storage tank, what are the groups of dry-type transformers? How to carry out the connection? Or basically introduce it with the network of dry-type transformer manufacturers.


Eravur townScb13-1250kva dry type transformerBrand strategy is the key to improving competitiveness



Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short, voltage transformation and blood pressure reduction must be carried out by the transformer.

The equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing, remove and replace the cracked or brittle leather pad, check and tighten the node, replenish the oil with less oil, check and replace the silica gel of the breathing mask, etc.

The voltage regulating tap changer is not in place or poor

Total quality management.The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

The hanging core of dry-type transformer is a vital part

Power transformer


Eravur townScb13-1250kva dry type transformerBrand strategy is the key to improving competitiveness



The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, i.e. insulation spacing.

retailer.Dry type transformer company

The transformer manufacturer will introduce the efficiency of the transformer to you

Noise dispersion of dry-type transformer

Eravur town.Equipped with a temperature controller, platinum thermistor (pt10) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.

The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, resistance to short-circuit faults, and long-term scalding of iron core will lead to insulation aging.