Laplace110 kV oil immersed transformerWhat are the continued rise resistance

announcer:hp122HP117294921 release time:2024-04-07 09:20:25

The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!

Careless maintenance and insulation damage

Laplace.Transformer manufacturers generally adopt IP20 protective casing which can avoid the entry of solid dirt with a diameter of more than 12mm, rats, snakes, cats, birds and other animals, resulting in vicious common faults such as short-circuit fault and power failure, and provide a safe natural barrier for the energized part. If the transformer equipment must be outdoors, IP23 protective casing can be adopted, which can avoid being equally divided with the above IP20 protective effects However, IP23 casing will reduce the refrigeration capacity of the transformer, so pay attention to the reduction of its operating volume.

Difference between dry-type transformer and oil immersed transformer:

.The key reason for oil leakage is that there are defects in cast iron parts

Under normal conditions, the operation and maintenance management staff shall improve the safety inspection range of the transformer,LaplaceAlarm temperature of dry-type transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.

Due to poor sealing, generally, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.


Laplace110 kV oil immersed transformerWhat are the continued rise resistance



A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?

In order to promote the use of energy-saving transformers, the Ministry of finance, the Ministry of industry and information technology and the national development and Reform Commission jointly promulgated the detailed rules for the implementation of energy-saving distribution transformers of energy-saving products benefiting the people project as early as 2012, providing subsidies of 4-30 yuan / KVA for energy-saving transformers.

After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.

technical service.Oil immersed transformer company

The noise of dry-type transformer comes from

Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies,LaplacePicture of oil immersed transformer disassembly, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.


Laplace110 kV oil immersed transformerWhat are the continued rise resistance



High voltage fuse of transformer breaks one phase;

Focus on Development.The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.

This is the example of power consumption engineering as power saving. The key reason is that the habitual calculation method ignores the copper loss.

The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.

Laplace.The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage so as to meet the needs of power consumption. In short, various insulating layer parts voltage transformation and blood pressure reduction must be carried out by the transformer.

It includes the performance and main uses of insulating layer materials, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.