Beit JalaHow much is 1250kva box transformerWhat is the factory way

announcer:hp122HP117294921 release time:2024-03-26 11:11:03

Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.

Oil immersed transformer company

Beit Jala.The common dry-type transformer is an important electrical equipment, and the voltage is constantly regulated. However, because of certain necessity, the dry-type transformer will also boost voltage, and the whole process of boosting voltage is very complex, and there are many principles.

In order to better reduce the probability of short-circuit fault of relay protection dry-type transformer, prevention and key are & ldquo; Prevention and Manipulation & rdquo; Is dominant.

.Analysis of common faults of oil immersed transformer:

(II) the height width ratio of dry-type transformer pier installed on the ground is generally 0.5m, and a guardrail of no less than 7m shall be installed around it, and a warning sign shall be hung at a prominent position.

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:


Beit JalaHow much is 1250kva box transformerWhat is the factory way



The noise of dry-type transformer belongs to low-frequency noise. In a small area, most of it is scattered according to the building structure. This kind of low-frequency noise is scattered to the household house according to the house building, and then causes gas vibration noise, which is then scattered to the ears of consumers. Although the amount of noise is not very large the dispersion spacing and adverse effects are very large.

Automatic system of centrifugal fan: measure the temperature data signal according to the PT100 thermistor temperature measuring resistor of the embedded parts at the hot part of the bottom pressure winding. The transformer load expands and the operating temperature increases. When the winding temperature reaches 110 ℃, the system software will automatically terminate the centrifugal fan.

Dry type transformer factory

Inspection standard.Power transformers are also used for testing the system software automatically starts the centrifugal fan for refrigeration; When the winding temperature is as low as 90 ℃, which are called test power transformers. They can be divided into inflatable, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, It is used to carry out insulation compressive strength test under required current for various electrical products electrical components and insulating raw materials.

When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules, and each module is replaced by an equivalent circuit, and its power circuit includes an inductance and vertical capacitance, a capacitance to ground or capacitance between windings, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.

The voltage regulating tap changer is not in place or poor


Beit JalaHow much is 1250kva box transformerWhat is the factory way



The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection,Beit JalaBox buried transformer, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.

technical service.When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.

When the operating oil is mixed with different types of new oil or used for oil, in addition to the accurate measurement of the cold filter point of the mixed oil, it is also necessary to carry out high and low temperature test and sludge test, and observe the sludge accumulation. The accumulation cannot be accessed. The results of the operation of the mixing template are not that the original oil is very poor, so it can be managed and used in a mixed manner.

Common problems of tap changer of power transformer

Beit Jala.The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, resistance to short-circuit faults,Beit JalaIs there a transformer in the distribution room, common faults and impact. The work is diligent.

The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, the insulation compressive strength of power transformer shall be tested before installation and operation,Beit JalaBox transformer recycler, and overload is not allowed in the whole process of operation.

When sampling in bulk gasoline barrels, samples shall be selected according to 5% of the number of gasoline barrels, samples shall be taken according to 2% of the total number of barrels (bottles).