FuxinComputer temperature controller for dry-type transformerHow to become a qualified operator

announcer:hp122HP117294921 release time:2024-03-26 09:09:28

The switching power supply lacks one phase of power;

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.

Fuxin.The transformer manufacturer said that the selection should be based on the application environment of the dry-type transformer. For the extremely extreme environment, the dry-type transformer should be poured with epoxy resin glue. Because this kind of environment does not need to heat the dry-type transformer, it can operate immediately. However, the class H dry-type transformer can be used.

Power transformer manufacturer

.Oil leakage of cast iron parts

Dry type transformer company

When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.


FuxinComputer temperature controller for dry-type transformerHow to become a qualified operator



The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by 20%.

The insulation between silicon steel sheets is damaged, the anchor bolt cover with the iron core is damaged the iron core causes large vortex,FuxinDistribution transformer core, resulting in heat, temperature rise, and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value,FuxinWhat is the price of 1000 KVA transformer, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.


FuxinComputer temperature controller for dry-type transformerHow to become a qualified operator



According to the condition of cracks galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.

technological innovation.In terms of the place of use, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, and most application places leading to fire accidents are easy to choose in large and medium-sized engineering buildings and multi-storey buildings;

How to maintain dry-type transformer?

The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment,FuxinHow much is a 1000 KVA transformer, the output capacity can be increased by 20%.

Fuxin.Connection group structure of dry-type transformer

The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore, it must also be changed to produce flexible connection.

For no-load impulse closing of transformer, pay attention to the following matters: