SribagawanTransformer box type transformerFactors that delay corrosion

announcer:hp122HP117294921 release time:2024-03-24 12:57:51

Sound in case of phase failure

When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.

Sribagawan.Several detection methods for installing transformer

High voltage fuse of transformer breaks one phase;

.On load commissioning:

The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at 12 o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.

The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ 4Ω, The resistor is generally more than 2000 & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only 1 / 500 of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.


SribagawanTransformer box type transformerFactors that delay corrosion



The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and D (or D) is triangular wiring.

The rate of transformer is: n = P2 / p1x1o%, that is, when the copper loss of transformer is equivalent to iron loss, the rate is very large. Therefore,SribagawanNo load loss of dry-type transformer, the load of transformer is: 0 = P / PK. Fully consider the active power loss caused by reactive power in the system software during transformer operation. The load adjustment is: it can be seen from the calculation of load formula that the large rate of transformer does not occur when the load is full, Generally, it is about 50%, but when selecting the transformer capacity, we should select effective transformers according to the load condition and load, so as to make the transformer in the situation of economic development and achieve the goal of power saving.

Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.

Installation requirements.If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.

When leaving the factory the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.

If the volume of power transformer is too small,SribagawanRecovery price of oil transformer, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.


SribagawanTransformer box type transformerFactors that delay corrosion



The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, maintenance and transportation, the Ministry of finance,SribagawanTransformer box type transformer, the Ministry of industry and information technology and the national development and Reform Commission jointly promulgated the detailed rules for the implementation of energy-saving distribution transformers of energy-saving products benefiting the people project as early as 2012, providing subsidies of 4-30 yuan / KVA for energy-saving transformers.

The power transformer conductor refers to the connecting transmission line between each electromagnetic coil between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.

Sribagawan.Connection group structure of dry-type transformer

The noise of dry-type transformer comes from

During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.