BirkikaraTechnical parameters of 10kV oil immersed transformerNew breakthroughs in product exports

announcer:hp122HP117294921 release time:2024-03-01 13:19:41

Power transformer manufacturer

Oil leakage at looper flange

Birkikara.Oil sample inspection & mdash; & mdash; the performance parameters such as compression resistance and residue shall be carried out every three years. The long-term overload or overload of the transformer can reduce the cycle time.

(IV) the transformer on the column shall be stable and firm and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

.When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.

The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.

Noise solution of dry-type transformer


BirkikaraTechnical parameters of 10kV oil immersed transformerNew breakthroughs in product exports



Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.

How to maintain dry-type transformer?

The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire,Birkikara800 KVA oil type transformer, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.

quality.Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.

Generally speaking,BirkikaraFully sealed oil immersed transformer, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer, disconnect the switching power supply on each side, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.

Fault judgment of power transformer


BirkikaraTechnical parameters of 10kV oil immersed transformerNew breakthroughs in product exports



Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.

safety requirements .When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.

Transformer manufacturers said that at this stage, coupled with the constraints of factors such as low threshold in the field uneven companies, lack of evaluation and specifications, and inadequate technical innovation, resulting in slow marketing of energy-saving transformers.

When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate),BirkikaraPower three-phase transformer, it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.

Birkikara.When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules, and each module is replaced by an equivalent circuit, a capacitance to ground or capacitance between windings, They also have mutual inductors between the inductors of each module, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.

The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.