BicklerInsulating oil of oil type transformerWhy is it so easy to break

announcer:hp122HP117294921 release time:2024-02-23 10:24:30

On load commissioning:

(II) the height width ratio of dry-type transformer pier installed on the ground is generally 0.5m, and a guardrail of no less than 7m shall be installed around it, and a warning sign shall be hung at a prominent position.

Bickler.Transformer inspection nose sniffing method

For 630kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.

.Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing large-scale power failure,BicklerS13 technical parameters of oil immersed transformer, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.

Sound in case of phase failure

In the electric field of the winding to the yoke, there must be a strong line breaking component, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.


BicklerInsulating oil of oil type transformerWhy is it so easy to break



The insulating layer in the middle of the silicon steel plate is aging the anchor bolt cover with the iron core is damaged, the iron core causes large vortex, resulting in heat, and the aging of the insulating layer is accelerated. The core insulation compressive strength of power transformer must be measured on time and accurately. If it is found that the insulation compressive strength is less than the index value, please remove and replace the anchor bolt cover or carry out insulation for the copper core cable.

With Vietnam and Malaysia, China's first UHV transmission experimental demonstration project, China Transformer Corporation has entered a breakthrough in the development trend. The commodity voltage grade and volume rank first in the world, occupying the main technical position of the industry development trend. In addition, it has promoted the continuous improvement and perfection of the technology of low-voltage transformers.

The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.

Packaging strategy.The switching power supply lacks one phase of power;

Solenoid insulation deterioration

The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ 4Ω The resistor is generally more than 2000 & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only 1 / 500 of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.


BicklerInsulating oil of oil type transformerWhy is it so easy to break



After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.

quality standard.Performance and main parameters of common metal composites, various welding processes and machinery and equipment, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology,BicklerTransformer variable frequency power supply, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, machinery and equipment of each process flow; The natural working environment is basically regulated.

Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.

Brief introduction of zero line of power transformer

Bickler.Therefore, it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly,BicklerMaximum allowable temperature of oil immersed transformer, and the harm will not expand to a greater extent.

In specific daily life, oil immersed transformers are released outward in the form of waves. This kind of wave is like a tide. It is also a kind of kinetic energy. In fact, the wave height of oil immersed transformer also shows the size of kinetic energy. Generally, computer automatic system is used to control the wavelength and frequency of electromagnetic wave. The longer the light wavelength is, the greater the output power is. On the contrary, it is very small.