Rio de JaneiroWhat is the principle of power transformerHow to eliminate the oscillation problem

announcer:hp122HP117294921 release time:2024-02-11 13:02:52

Rio de JaneiroDistribution 400 KVA transformer,

The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation,Rio de JaneiroMining dry-type power transformer, and overload is not allowed in the whole process of operation.

During no-load test run, and then make the working voltage impulse closing.

Rio de Janeiro.Transformer inspection nose sniffing method

Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.

.Equipped with a temperature controller, platinum thermistor (pt10) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.

The key reason for oil leakage is that there are defects in cast iron parts

Oil immersed transformer


Rio de JaneiroWhat is the principle of power transformerHow to eliminate the oscillation problem



Therefore,Rio de JaneiroLoss table of distribution transformer, in the operation prevention and regulation of relay protection dry-type transformer it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.

At rated power, the ratio of output power to input power of transformer is called the efficiency of transformer, i.e. & ETA; Is the efficiency of the transformer; P1 is the input power and P2 is the output power.

Brief introduction of zero line of power transformer

Finance Department.Oil leakage of cast iron parts

The oil in the machinery and equipment of the oil storage tank shall generally stand for more than 8h before sampling; it is not necessary to stand when sampling on the running power transformer.

When the full load test is carried out and everything is normal, the load can be connected.


Rio de JaneiroWhat is the principle of power transformerHow to eliminate the oscillation problem



Oil leakage at looper flange

consumption.Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.

Visual inspection method for transformer inspection

The key reason for oil leakage is that there are defects in cast iron parts

Rio de Janeiro.When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.