TulsaPrice of 400KVA dry type transformerWhat's the configuration and characteristics of it?

announcer:hp122HP117294921 release time:2024-02-08 13:04:11

If the power transformer stops running for more than 72h (if the allowable time should be reduced when the ambient humidity is & amp; gt; 95%), it should be insulated before putting into use, and accurately measured with a 2500V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ 300mfl, the insulation resistance from the secondary side to the ground should be ^ 100mh, and the insulation resistance from the iron core to the ground should be & amp; gt; 5mfl (note that the grounding device piece should be removed).

How to reduce the failure of dry-type transformer?

Tulsa.In order to better avoid overvoltage damage, a group of overvoltage maintenance high-voltage Arresters (such as y4cs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.

(II) the height width ratio of dry-type transformer pier installed on the ground is generally 0.5m, and a guardrail of no less than 7m shall be installed around it, and a warning sign shall be hung at a prominent position.

.It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard,Tulsa35kV oil type transformer, production process and quality standard of electromagnetic shielding.

Oil leakage at looper flange

When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective,TulsaPower transformer insulating oil test, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.


TulsaPrice of 400KVA dry type transformerWhat



Operation and maintenance management of oil immersed transformer

The efficiency of transformer is closely related to the output power level of transformer. Generally, the smaller the loss to output power ratio and the higher the efficiency. On the contrary, the smaller the output power, the lower the efficiency.

With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed,TulsaDry type transformer belongs to energy-saving transformer, the accuracy of calculation conclusions can meet the needs of architectural design, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.

Product line.The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules, and each module is replaced by an equivalent circuit, and its power circuit includes an inductance and vertical capacitance a capacitance to ground or capacitance between windings, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.

how.Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.

This is the example of power consumption engineering as power saving. The key reason is that the habitual calculation method ignores the copper loss.

Sound causing short circuit obstruction. If not handled properly, it will cause great damage.

Tulsa.Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ 4Ω, The resistor is generally more than 2000 & omega;, According to Ohm's law, when the insulating layer is damaged, so as to play a guarantee effect. The higher the voltage the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.

When oil samples are used, the safety and fire safety technical specifications on the spot shall be strictly implemented.